The File You Build Before the Final Inspection: Controlling Dilapidations as a UK Tenant

Davis & Co
The File You Build Before the Final Inspection: Controlling Dilapidations as a UK Tenant

Photo: commercial lease documents keys empty office interior inspection clipboard, via landmarksarchitects.com

End-of-lease dilapidations are often treated as a final argument. In practice, they are a documentary exercise that begins long before the final inspection. For UK company directors occupying commercial premises, the bill at exit is shaped by the lease, the schedule of condition, maintenance records and the correspondence exchanged during the term. In 2026, with occupational costs under close review, a tenant that can produce a clean evidence file is better placed to resist work it never agreed to fund.

Repairing Is Not the Same as Reinstating

A lease may impose a repairing obligation, a reinstatement obligation, or both. Repairing covenants generally require the tenant to keep the premises in the state contemplated by the lease, often subject to a schedule of condition and sometimes to fair wear and tear. Reinstatement is different: it usually requires the removal of alterations, additions, signage, cabling or partitions and the return of the property to its original configuration. The distinction matters because a landlord may present a single schedule mixing repair, decoration, compliance and reinstatement. Each item should be traced back to a specific clause.

Directors should also check whether the repairing obligation is full repairing and insuring, internal only, or qualified by a schedule of condition. A schedule of condition is not a decorative annexe. It is the benchmark against which the exit condition may be measured. Where it exists, the question is not whether the premises are in perfect condition, but whether they are materially worse than the recorded state, allowing for the lease terms.

The Schedule of Condition Is the Tenant's Best Evidence

If a schedule of condition was prepared at the start of the term, locate it, read it and compare it with current photographs. If no schedule exists, the tenant should build a contemporaneous record now: dated photographs, a room-by-room note, contractor reports and invoices for works carried out. This record is useful both for day-to-day management and for any later discussion about liability.

Evidence should be factual rather than argumentative. A photograph of a marked floor, a dated maintenance log and an invoice for a repaired door are more persuasive than a general assertion that the premises were well kept. Where alterations were made, keep the landlord's written consent, the specification and the completion records. Those documents show what was authorised and what may later need to be removed.

Interim Schedules and Early Resolution

A landlord may serve an interim schedule of dilapidations during the term, not only at expiry. An interim schedule can be useful: it identifies works early, allows the tenant to plan and may reduce the risk of a large final claim. It should not, however, be accepted without scrutiny. The tenant should check that each item is required by the lease, that the proposed method is proportionate and that the cost is evidenced.

Early negotiation can suit both parties. A landlord may prefer works completed before marketing; a tenant may prefer a cash settlement to avoid disruption. Any agreement should be in writing and should identify the works, the standard, the timing and the VAT treatment. A general letter saying that the tenant will 'deal with dilapidations' is rarely enough.

VAT, Timing and the Final Bill

VAT is often overlooked. Dilapidations payments and works can carry VAT, and a tenant that is not VAT-registered will feel the full cost. A VAT-registered tenant may be able to recover VAT, subject to its own partial exemption position. The tenant should ask for a VAT invoice and confirm whether the sum is a payment for works, damages or a settlement. The answer can affect both cash flow and records.

Timing also matters. The tenant should start the exit review at least six to nine months before expiry, earlier for larger premises. That allows time to obtain quotes, agree scope and complete works without holding over. The tenant should also ask about the landlord's intentions. If the landlord plans to redevelop or change use, the recoverable loss may be different from the cost of a full schedule. That is a point for professional advice, but it is worth raising early.

A Pre-Exit Checklist for Directors

The final bill is rarely the whole story. It is the end of a paper trail. A UK tenant that treats dilapidations as a live record during the lease, rather than a dispute at expiry, is less likely to pay for work that was never its obligation. This article is general information and not legal advice; lease terms and individual circumstances should be reviewed by a qualified adviser.

All Articles

Related Articles

Short Leases, Long Decisions: Occupying a Pop-Up Unit Without Inheriting a Problem

Short Leases, Long Decisions: Occupying a Pop-Up Unit Without Inheriting a Problem

When the New Rateable Value Lands: A Director’s Playbook for the 2026 Business Rates Cycle

When the New Rateable Value Lands: A Director’s Playbook for the 2026 Business Rates Cycle

From Kitchen Table to Leasehold: A 2026 Field Guide to Your First UK Business Premises

From Kitchen Table to Leasehold: A 2026 Field Guide to Your First UK Business Premises